PUBLIC MEETING – Engineering Division

October 24 @ 5:00 pm-7:00 pm

|Recurring Event (See all)

One event on October 24, 2019 at 5:00 pm

Construction Workers

The Engineering Division is hosting the following public meetings on October 17 & 24. Each meeting is located at the Municipal Services Center, 3600 Tremont Road:

McCoy Road Improvements Project
6-7:30 pm, Thursday, October 17, 2019
In 2020, as part of the City’s Capital Improvement Program, the section of McCoy Road from Kenny Road to Mountview Road is slated for a new waterline, roadway resurfacing, as well as spot curb and gutter repairs. A key goal is to not only replace the aging infrastructure, but to maintain the residential feel of this primary connector, while not congesting traffic flow. In August, an online survey was made available seeking resident input on the two primary options—to proceed with the road diet and addition of bike lanes OR to make no changes. In summary, the survey was completed by 913 people, with 564 (61.77%) favoring a road diet. The Engineering Division recommends implementing a road diet– converting the four-lane undivided roadway to a two-lane roadway with a two-way left turn lane. All turn lanes at signalized intersections will be evaluated to reduce delays if needed. Benefits include reduced vehicle speeds, improved mobility and access, addition of east/west bicycle lanes, reduced collisions and injuries and improved livability and quality of life.

Northwest Boulevard Improvements Project
5-7 pm, Thursday, October 24, 2019
Improvements to Northwest Boulevard is an exciting project for the City of Upper Arlington. The project will improve Northwest Boulevard from Wilshire Drive to Barrington Road while also addressing flooding concerns along the corridor. As part of the City’s 2020 Capital Improvement Program, this section of Northwest Boulevard is slated for base reconstruction and street resurfacing, new curb and gutter, and improvements to the storm sewer system.

Mountview Road Improvements Project
5-7 pm, Thursday, October 24, 2019
Improvements to Mountview Road is an exciting project for the City of Upper Arlington. The project will improve Mountview Road from Fishinger Road to Zollinger Road while also addressing walkability and flooding concerns along the corridor. As part of the City’s 2020 Capital Improvement Program, this section of Mountview Road is slated for street resurfacing, new curb and gutter, improvements to the storm sewer system, water main replacements, a new sidewalk on the west side of Mountview and street trees.

Details

Date:
October 24
Time:
5:00 pm-7:00 pm
Event Category:
Event Tags:
,

Organizer

City of UA
Phone:
614-583-5000
Email:
webmaster@uaoh.net

Venue

Council Chambers – MSC
3600 Tremont Rd
Upper Arlington, OH 43221 United States
+ Google Map
Phone:
614-583-5000

Submissions to our Community Calendar
As a service to the community, the City hosts an online Community Calendar. We invite you to submit details of upcoming special events that are open to and promote government interests of the community at-large, as determined by the City of Upper Arlington.

To submit a calendar listing, please use this online form. Submissions should include a photograph (no posters or logos) with a minimum size of 1920 pixels wide x 1275 pixels high. We recommend that you submit items at least three months in advance, since we may include some community events in the City’s print and e-newsletters as space allows.

The City will not post routine items such as programs, club meetings or classes. The inclusion of a special event does not represent an endorsement from the City. The City reserves complete control of any event postings on the Community Calendar and has final approval authority over them. Community Calendar postings are not intended to, and do not, create a public or designated forum for private speech of any kind. The City reserves its right to refuse a submission

Back To Top