Ruscilli Construction Company will be conducting a large-scale concrete pour for the competition gymnasium at the High School on Wednesday, September 2. Due to the nature and scope of the work, Ruscilli has received approval from the City to run these operations from 5 am-7 pm.

The contractor is required to have concrete trucks access the worksite using Zollinger, Mount Holyoke, Ridgeview and Brandon roads only, with NO construction vehicles allowed to use any other residential streets. The traffic pattern within the work site has been designed to minimize the need for the backing of trucks, thereby reducing the use of backup beepers. Any temporary lighting required to facilitate this work must be directed into the project, and away from the residential neighborhood.